Before You Start: The Right Expectations
Starting a nearshore project is not a procurement decision — it’s a partnership decision. Success depends less on the number of profiles than on the quality of collaboration, the clarity of requirements and the willingness to treat the external team as part of your own.
This guide walks you through setting up a nearshore project professionally — and which mistakes to avoid.
Phase 1: Discovery (Week 1)
The First Call
A good first call takes 30–45 minutes and answers three questions:
- What is the goal? Not the technical goal, but the business one: what problem are you solving? What value does the project create?
- What does the current setup look like? Existing team, tech stack, processes, architecture.
- What are the constraints? Budget, timeline, compliance requirements, stakeholders.
Model Selection
Based on the first call we recommend one of three models:
| Model | Suited for | Typical team size |
|---|---|---|
| Dedicated team | Ongoing product development, long-term collaboration | 3–15 profiles |
| Product development | End-to-end ownership of a product or feature | 5–20 profiles |
| Managed services | Ongoing operations, support, maintenance | 2–8 profiles |
The models are not rigid — many projects start as a dedicated team and transition to managed services after go-live.
Phase 2: Team Setup (Weeks 2–4)
Profile Definition
Together we define the required profiles: technology stack, seniority, language requirements, industry-specific experience. The principle: better a smaller team with the right profiles than a large team with compromises.
Candidate Introductions
You meet every candidate — via video call, with a technical assessment and references. No anonymous CV matching, no surprises. If there’s no fit, we present alternatives.
Contractual Foundations
In parallel with team setup we address:
- Framework agreement with Klarnode GmbH as German contract partner
- DPA (data processing agreement) for GDPR compliance
- NDAs at team level
- SLAs for availability, response times and escalation
Phase 3: Integration & Sprint 1 (Weeks 3–5)
Technical Onboarding
In the first week the team familiarizes itself with your environment:
- Repository access, CI/CD pipeline, deployment process
- Architecture documentation and coding standards
- Tool setup: Jira, Azure DevOps, Confluence, Slack or Teams
- Access to staging and test environments
The First Sprint
From week two the team works productively in your sprints. The first sprint should be deliberately kept manageable — the goal is not maximum velocity but:
- Working delivery process: Code is committed, reviewed, merged and deployed
- Quality proof: The first pull requests show whether code standards and architecture understanding are right
- Communication patterns: Stand-ups, sprint reviews and retrospectives are established
Phase 4: Steady State & Scaling
Continuous Improvement
After the first 2–3 sprints the team has found its rhythm. Now it’s about optimization:
- Stabilize velocity: Sprint capacity becomes predictable
- Address technical debt: Plan deliberately in the backlog
- Knowledge transfer: Documentation, pair programming, architecture decision records
Scaling on Demand
If you need more capacity for a release or critical phase, we add profiles within 2–3 weeks. Existing team members handle onboarding — ensuring quality and culture even during growth.
Model Transition
After go-live many clients switch from a dedicated team to managed services: reduced team size, defined SLAs for operations and maintenance, proactive monitoring. The transition is seamless — without new contract negotiations.
Checklist: Start a Nearshore Project
- Business goal and project context defined
- First call with nearshore partner completed
- Model recommendation received and evaluated
- Profiles defined and candidates met
- Framework agreement, DPA and NDAs signed
- Repository access and tool setup prepared
- Onboarding week planned
- First sprint planned (deliberately manageable)
- Communication channels and meeting cadence set
- Escalation paths and contacts defined
Conclusion
Starting a nearshore project doesn’t have to be complex. With the right partner, clear expectations and a structured onboarding process, you go from first call to productive team in 3–5 weeks.